Search results

  • ...ance of the projects developed by science. This subject was covered by our team work in the Synenergene project, which is described here.</br></p> ...o assess the concerns and fears of the population about this approach, the team conducted a survey at different points of Belo Horizonte.</br></p>
    17 KB (2,584 words) - 03:52, 19 September 2015
  • The idea of teaching an “Engineered Machines” summer course at the university su Week 9: 1rst Engineered Machines Summer Course”, held at UFMG’s campus.
    10 KB (1,647 words) - 16:03, 17 September 2015
  • <ul><li>The idea of teaching an “Engineered Machines” summer course at the university su <li>Week 9: 1rst Engineered Machines Summer Course”, held at UFMG’s campus.</ul><br/>
    11 KB (1,795 words) - 00:29, 19 September 2015
  • ...omplete PDF file <a href="https://static.igem.org/mediawiki/2015/9/9b/UFMG-Brazil-ApplicationScenarios.pdf">here</a>.<br/></p> <p>In addition, the team is building a Kill Switch system based on the control of the gene of the en
    11 KB (1,771 words) - 23:12, 18 September 2015
  • ...rated_Human_Practices#2>specialist</a> and a <a href=https://2015.igem.org/Team:UFMG_Brazil/Integrated_Human_Practices#3>member from a non-governmental org ...o deal with this issue, the team conducted a <a href=https://2015.igem.org/Team:UFMG_Brazil/Public_Engagement#4>survey in Belo Horizonte</a>. After giving
    4 KB (639 words) - 03:21, 19 September 2015