Template:SJTU-BioX-Shanghai/Notebook/Construction/w10

SJTUB construction logo.jpg Construction

Sep. 7

Transformation of PcpcG2-HR-Mut into DH5a and plating. After incubation for 12h, Inoculated single colonies into liquid LB culture (10 tubes for test group and 2 for control group).

Sep. 8

Plasmid extraction.

Double restriction enzyme digestion.

Restriction Enzyme Digestion
ddwater 280μl
FD buffer 40μl
XbaI 20μl
EcoRI 20μl
Template 2μl/tube
Total volume 400μl(20μl*20)
  • Template included PcpcG2-HR-Mut, PcpcG2-HR and 0 control.

Agarose gel electrophoresis test.


Sep. 9

Sequencing PcpcG2-HR-Mut-4 and PcpcG2-HR-Mut-9.


Sep. 10

Sequencing results proved right.


Sep. 17

Functional fragments restriction enzyme digestion.

Pdark-GFP Pdark-HR PcpcG2-HR
ddwater 15μl 15μl 15μl
FD buffer 2μl 2μl 2μl
XbaI 1μl 1μl 1μl
PstI 1μl 1μl 1μl
Template 1.3μl 1μl 0.9μl
Total volume 20μl 20μl 20μl

SJTUB 0917.jpg