Difference between revisions of "Team:William and Mary/Notebook"
Line 299: | Line 299: | ||
<li>Attempted to Gibson assemble YFP + CFP under control of R0010</li></ul> | <li>Attempted to Gibson assemble YFP + CFP under control of R0010</li></ul> | ||
<h3>Week 3 (6/15-6/21)</h3> | <h3>Week 3 (6/15-6/21)</h3> | ||
− | <ul> | + | <ul type="circle"> |
<li>Re-attempted Gibson assembly to make a double fluorescent construct with proteins under R0010</li> | <li>Re-attempted Gibson assembly to make a double fluorescent construct with proteins under R0010</li> | ||
<li>Began assembling parts for the Interlab Study</li> | <li>Began assembling parts for the Interlab Study</li> | ||
Line 308: | Line 308: | ||
<li>Designed and started the assembly process to make KanR (necessary to integrate parts onto the E. coli genome)</li></ul> | <li>Designed and started the assembly process to make KanR (necessary to integrate parts onto the E. coli genome)</li></ul> | ||
<h3>Week 4 (6/22-6/28)</h3> | <h3>Week 4 (6/22-6/28)</h3> | ||
− | <ul><li>Many of our past assemblies (dCas9, double fluorescent constructs, etc) failed. We continued attempts at these assemblies.</li></ul> | + | <ul type="circle"><li>Many of our past assemblies (dCas9, double fluorescent constructs, etc) failed. We continued attempts at these assemblies.</li></ul> |
</p> | </p> | ||
Line 341: | Line 341: | ||
<div class="project-text"> | <div class="project-text"> | ||
<h3>Week 1 (6/29-7/5)</h3> | <h3>Week 1 (6/29-7/5)</h3> | ||
− | <ul><li>We have assembled our gRNAs and dCas9!</li> | + | <ul type="circle"><li>We have assembled our gRNAs and dCas9!</li> |
<li>We ordered primers to integrate onto the E. coli genome</li> | <li>We ordered primers to integrate onto the E. coli genome</li> | ||
<li>Designed assembly to put a KanR operon after a fluorescent construct to integrate</li> | <li>Designed assembly to put a KanR operon after a fluorescent construct to integrate</li> | ||
Line 350: | Line 350: | ||
<li>Attempted our first double electroporation-transformation to test our dCas9 and gRNAs</li></ul> | <li>Attempted our first double electroporation-transformation to test our dCas9 and gRNAs</li></ul> | ||
<h3>Week 2 (7/6-7/12)</h3> | <h3>Week 2 (7/6-7/12)</h3> | ||
− | <ul><li>Began assembling CFP and YFP operons with each promoter that we wanted to test</li> | + | <ul type="circle"><li>Began assembling CFP and YFP operons with each promoter that we wanted to test</li> |
<li>Confirmed that dCas9 and our gRNA design works</li> | <li>Confirmed that dCas9 and our gRNA design works</li> | ||
<li>Assembled the CFP under R0010 with KanR, so that it can be PCR’d with the integration PCRs, and integrated</li> | <li>Assembled the CFP under R0010 with KanR, so that it can be PCR’d with the integration PCRs, and integrated</li> | ||
<li>Attempted to make TetR operon</li></li> | <li>Attempted to make TetR operon</li></li> | ||
<h3>Week 3 (7/13-7/19)</h3> | <h3>Week 3 (7/13-7/19)</h3> | ||
− | <ul><li>Attempted to test our integration protocol, by integrating KanR onto the E. coli genome</li> | + | <ul type="circle"><li>Attempted to test our integration protocol, by integrating KanR onto the E. coli genome</li> |
<li>Continued attempting to construct Interlab Parts</li> | <li>Continued attempting to construct Interlab Parts</li> | ||
<li>Worked on our collaboration with UGA</li> | <li>Worked on our collaboration with UGA</li> | ||
Line 362: | Line 362: | ||
<li>Continued attempts to make TetR operon</li></ul> | <li>Continued attempts to make TetR operon</li></ul> | ||
<h3>Week 4 (7/20-7/26)</h3> | <h3>Week 4 (7/20-7/26)</h3> | ||
− | <ul><li>Began testing integrator cassette part</li> | + | <ul type="circle"><li>Began testing integrator cassette part</li> |
<li>Continued working on Interlab Study</li> | <li>Continued working on Interlab Study</li> | ||
<li>Continued assembling CFP and YFP operons</li> | <li>Continued assembling CFP and YFP operons</li> | ||
<li>Continued attempts to make TetR operon</li></ul> | <li>Continued attempts to make TetR operon</li></ul> | ||
<h3>Week 5 (7/26-8/2)</h3> | <h3>Week 5 (7/26-8/2)</h3> | ||
− | <ul><li>Ordered gBlocks for Interlab Study</li> | + | <ul type="circle"><li>Ordered gBlocks for Interlab Study</li> |
<li>Continued working on assembling all gRNA parts</li> | <li>Continued working on assembling all gRNA parts</li> | ||
<li>Continued assembling CFP and YFP operons</li> | <li>Continued assembling CFP and YFP operons</li> | ||
Line 373: | Line 373: | ||
<li>Continued attempts to make TetR operon</li></ul> | <li>Continued attempts to make TetR operon</li></ul> | ||
</p> | </p> | ||
− | |||
</div> | </div> | ||
</div> | </div> | ||
Line 389: | Line 388: | ||
<div class="container"> | <div class="container"> | ||
<div class="project-title"> | <div class="project-title"> | ||
− | + | <h1>August</h1> | |
− | < | + | |
<div class="separator-container"> | <div class="separator-container"> | ||
<div class="separator line-separator">✻</div> | <div class="separator line-separator">✻</div> | ||
Line 397: | Line 395: | ||
<div class="product"> | <div class="product"> | ||
<div class="row"> | <div class="row"> | ||
− | <div class="col-md- | + | <div class="col-md-12"> |
− | <div class="project-text | + | <div class="project-text"> |
− | < | + | <h3>Week 1 (8/3-8/9)</h3> |
− | Continued assembling CFP and YFP operons | + | <ul type="circle"><li>Continued assembling CFP and YFP operons</li> |
− | Began assembling CFP operons with KanR (to integrate) | + | <li>Began assembling CFP operons with KanR (to integrate)</li> |
− | Continued attempts to make TetR operon | + | <li>Continued attempts to make TetR operon</li></ul> |
− | 8/10-8/23: School mandates that we leave | + | <h2>8/10-8/23: School mandates that we leave</h2> |
− | During this time, we learned that TetR had been mislabelled, and the part we were actually looking to assemble to confer tetracycline resistance was “TetA” | + | <ul type="circle"><li>During this time, we learned that TetR had been mislabelled, and the part we were actually looking to assemble to confer tetracycline resistance was “TetA”</li> |
− | We designed PCRs to assemble TetA | + | <li>We designed PCRs to assemble TetA</li></ul> |
− | Week 4 (8/24-8/30) | + | <h3>Week 4 (8/24-8/30)</h3> |
− | Continued working on Interlab Study | + | <ul type="circle"><li>Continued working on Interlab Study</li> |
− | Began assembling YFP operons with TetA (to integrate) | + | <li>Began assembling YFP operons with TetA (to integrate)</li> |
− | Began attempts to integrate YFP operons with TetA for which there was a corresponding CFP operon with KanR | + | <li>Began attempts to integrate YFP operons with TetA for which there was a corresponding CFP operon with KanR</li> |
− | </ | + | </ul> |
− | + | ||
</div> | </div> | ||
</div> | </div> | ||
− | <div class="col-md- | + | <div class="col-md-0"> |
− | + | ||
− | + | ||
− | + | ||
</div> | </div> | ||
− | <div class="col-md- | + | <div class="col-md-0"> |
<div class="project-text"> | <div class="project-text"> | ||
− | + | ||
− | + | ||
</div> | </div> | ||
</div> | </div> |
Revision as of 02:07, 19 September 2015
Our Notebook On this page you can view the work we did each month, from June through September. You can also find our protocols. Important Protocols Easy access to our most complex protocols.June
Week 1 (6/1-6/7)
Week 2 (6/8-6/14)
Week 3 (6/15-6/21)
Week 4 (6/22-6/28)
July
Week 1 (6/29-7/5)
Week 2 (7/6-7/12)
Week 3 (7/13-7/19)
Week 4 (7/20-7/26)
Week 5 (7/26-8/2)
August
Week 1 (8/3-8/9)
8/10-8/23: School mandates that we leave
Week 4 (8/24-8/30)