Difference between revisions of "Team:Leicester/Notebook/Week1"
Line 112: | Line 112: | ||
<ul class="timeline"> | <ul class="timeline"> | ||
− | + | <li class="timeline-inverted"> | |
− | <div class="timeline-badge"><i class="glyphicon glyphicon- | + | <div class="timeline-badge warning"><i class="glyphicon glyphicon-credit-card"></i></div> |
<div class="timeline-panel"> | <div class="timeline-panel"> | ||
<div class="timeline-heading"> | <div class="timeline-heading"> | ||
<h4 class="timeline-title">29th June 2015</h4> | <h4 class="timeline-title">29th June 2015</h4> | ||
− | + | <p><small class="text-muted"><i class="glyphicon glyphicon-time">09:00-18:00</i></small></p> | |
</div> | </div> | ||
<div class="timeline-body"> | <div class="timeline-body"> | ||
+ | <p><b>Measurement Study</b></p> | ||
<p>Mini prep of the liquid cultures were made and then nano drops were done</p> | <p>Mini prep of the liquid cultures were made and then nano drops were done</p> | ||
</div> | </div> | ||
</div> | </div> | ||
</li> | </li> | ||
− | <li | + | <li> |
− | <div class="timeline-badge | + | <div class="timeline-badge"><i class="glyphicon glyphicon-check"></i></div> |
<div class="timeline-panel"> | <div class="timeline-panel"> | ||
<div class="timeline-heading"> | <div class="timeline-heading"> | ||
<h4 class="timeline-title">30th June 2015</h4> | <h4 class="timeline-title">30th June 2015</h4> | ||
− | + | <p><small class="text-muted"><i class="glyphicon glyphicon-time"></i></small></p> | |
</div> | </div> | ||
<div class="timeline-body"> | <div class="timeline-body"> | ||
− | |||
<p>1% agarose gels were made to ensure that the products we wanted were present in solution</p> | <p>1% agarose gels were made to ensure that the products we wanted were present in solution</p> | ||
</div> | </div> |
Revision as of 13:30, 17 September 2015
Week 1
-
21 June 2015
Go fund me page for the Leicester iGEM team was first created as such: Leicester iGEM Go fund me
-
22nd June 2015
09:00-18:00
Start of Labs
Making of agar plates with chloramphenicol, ready to used the next day to streak bacteria
-
23rd June 2015
09:00-18:00
Start of Measurement Study
-Suspension of parts required for each device required in the measurement study. The parts (Promoter and GFP) were then transformed into DH5(alpha) bacteria. This is then placed on agar plates made the day before.
-
24th June 2015
09:00-18:00
Measurement Study
Bacteria produced from the streaks from the previous day are then restreaked again
-
25 June 2015
09:00-18:00
Measurement Study
The restreaks are taken and placed into liquid culture
Week 2
-
29th June 2015
09:00-18:00
Measurement Study
Mini prep of the liquid cultures were made and then nano drops were done
-
30th June 2015
1% agarose gels were made to ensure that the products we wanted were present in solution