Difference between revisions of "Team:Kent/Notebook"

Line 30: Line 30:
 
             <li class="hmain">  
 
             <li class="hmain">  
 
               <a href="#June">June 2015</a>
 
               <a href="#June">June 2015</a>
                </li>
+
              <ul>
                  <li>
+
                <li>
                    <a href="#July"> July 2015 </a>
+
               
                      <ul>
+
                        </li> 
+
 
                    
 
                    
 
                                      
 
                                      
Line 63: Line 61:
 
<tr>
 
<tr>
 
</table>
 
</table>
 +
 +
<br><br>
 +
</li>
 +
</ul>
 +
</li>
 +
<li class="hmain"
 +
<a href="#July">July 2015</a>
 +
<ul>
 +
<li>
 +
 +
  
 
<table class="table1">  
 
<table class="table1">  
Line 82: Line 91:
 
<tr>
 
<tr>
 
</table>
 
</table>
 +
 +
</li>
 +
</ul>
 +
</li>
 +
<ul>
 +
<li class="hmain">
 +
<a href="#August"> August 2015</a>
 +
<ul>
 +
<li>
 +
  
 
<table class="table1">  
 
<table class="table1">  
 +
<a name="#August"></a>
 
<tr>  
 
<tr>  
 
     <th colspan="100%"> <p align="center"> August </p> </th>  
 
     <th colspan="100%"> <p align="center"> August </p> </th>  
Line 102: Line 122:
 
<tr>
 
<tr>
 
</table>
 
</table>
 +
 +
</li>
 +
</ul>
 +
</li>
 +
<li class="hmain">
 +
<a href="#September">September 2015</a>
 +
<ul>
 +
<li>
 +
 
<table class="table1">  
 
<table class="table1">  
 +
<a name="September"></a>
 
<tr>  
 
<tr>  
     <th colspan="100%"> <p align="center"><a name="September"> September </a> </p> </th>  
+
     <th colspan="100%"> <p align="center"> September </p> </th>  
 
<tr>
 
<tr>
 
     <th> M </th> <th> T </th> <th> W </th><th> T </th><th> F </th><th> S </th><th> S </th>
 
     <th> M </th> <th> T </th> <th> W </th><th> T </th><th> F </th><th> S </th><th> S </th>
Line 120: Line 150:
 
</table>
 
</table>
  
</div>
+
</li>
 +
</ul>
 +
</li>
  
 +
</div>
 +
</div>
  
 
<br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br>
 
<br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br>

Revision as of 12:30, 17 July 2015


iGEM Kent 2015

Notebook

  • June 2015
    • June

      M T W T F S S
      1 2 3 4 5 6 7
      8 9 10 11 12 13 14
      15 16 17 18 19 20 21
      22 23 24 25 26 27 28
      29 30


  • July 2015
    • August 2015
      • August

        M T W T F S S
        1 2
        3 4 5 6 7 8 9
        10 11 12 13 14 15 16
        17 18 19 20 21 22 23
        24 25 2627 28 29 30
        31
    • September 2015
      • September

        M T W T F S S
        1 2 3 4 5 6
        7 8 9 10 11 12 13
        14 15 16 17 18 19 20
        21 22 23 24 25 26 27
        28 29 30



















Day 1 Wet lab 22/06/15

  • Made LB plates
  • Made LB broth
  • TIPS autoclaved
  • Day 2 Wet lab 23/06/15

  • Set up Top10 overnight, VS45 overnight, US348 overnight
  • Meeting with advisors to discuss progress
  • Day 3 Wet lab 24/06/15

  • Filter sterilise the buffer
  • 250ml no antibiotic broth, put top10 cells in
  • Incubate until optical density is 0.6
  • Miniprep PSB1C3 plasmid
  • Day 4 Wet lab 25/06/15

  • Transformation
  • Prepare SBC media
  • Digest of PSB1c3 from MS348
  • Day 5 Wet lab 26/06/15

  • Calculated competent cell efficiency
  • Agarose gel formation
  • Gel electrophoresis
  • Day 6 Wet lab 29/06/15

    Transforming linear PSB1C3

    Day 7 Wet lab 30/06/15

  • Miniprep of PSB1A3 plasmid
  • Gel electrophoresis of a large quantity of PSB1C3
  • Meeting with advisors to discuss progress
  • Day 8 Wet lab 01/07/15

  • Gel electrophoresis of the purified DNA extracted
  • Transformation of pSB1A3 circular plasmid to VS45 cells (competent)
  • Digest of all pSB1C3 plasmids
  • Day 9 Wet lab 02/07/15

  • Competent cells transformation efficiency
  • Mini-prep of 1MS340 to get pSB1C3 plasmid
  • Gel extraction of big digest
  • Quantification of the digest. Added sample buffer to each digest
  • Day 10 Wet lab 03/07/15

  • Transformation efficiency
  • Day 11 Wet lab 06/07/15

  • TOP10 cells containing pSB1A3 with limonene synthase were cultured overnight on AMP plates
  • Colonies of VS45 containing pSB1A3 were patched onto chloramphenicol plates
  • Overnight digest of miniprepped pSBIC3 using ECORI and PSTl
  • Day 12 Wet lab 07/07/15

  • Agarose gel of overnight digest - no bands were visible
  • Set up overnight cultures of pSBIC3 and pSBIA3 to be miniprepped the next day
  • Set up an overnight digest of pSBIC3
  • Day 13 Wet lab 08/07/15

  • Agarose gel of overnight digest - no bands were visible
  • Miniprep of pSBIA3 and pSBIC3
  • Overnight digest of pSBIA3 and pSBIC3
  • Day 14 Wet lab 09/07/15

  • Agarose gel of digested pSBIA3 and pSBIC3 - no bands were visible
  • Overnight cultures of MS349 containing pSBIA3 LIMS and MS340 containing pSBIC3 were set up, ready to be miniprepped
  • Day 15 Wet lab 10/07/15

  • Miniprep of plasmids pSBIA3 and pSBIC3
  • Day 16 Wet lab 13/07/15

  • Overnight cultures of MS349 containing pSBIA3 LIMS and MS340 containing pSBIC3 were set up, ready to be miniprepped
  • Overnight digest of miniprepped plasmids pSBIA3 and pSBIC3 using the enzymes ECORI and PSTI
  • Day 17 Wet lab 14/07/15

  • Agarose gel of digested plasmids pSBIA3 and pSBIC3 - it finally worked!!!
  • Miniprep of overnight cultures
  • Gel extraction of both plasmids
  • Analytical gel using Hyperladder I to quantify the plasmid
  • Overnight cultures of Top10 cells containing PVS72

    Day 18 Wet lab 15/07/15

  • Miniprepped PVS72
  • Transformation of VS45 with PVS72
  • Made LB plates with Chloramphenicol and Ampicillin
  • Plated the transformed VS45 cells on the Chloramphenicol/Ampicillin plates
  • Agarose gel of leftover digested pSBIA3 and pSBIC3 from 14/07/15
  • Gel extraction of pSBIA3 and pSBIC3
  • Day 19 Wet lab 16/07/15

  • Counted the overnight colonies of VS45 with PVS72
  • Calculated the transformation efficiency