Difference between revisions of "Team:SPSingapore/Notebook-Week-8"
Line 386: | Line 386: | ||
<br> ▶ Tubes 1&2, 5&6 have bands <750bp as well as primer dimers (but the annealing temperature was calculated for prefix suffix primers not universal ones…I’ll try thermo-gradient thermocycler protocol next time). Expected band size for 5&6 (FP-prefix, RP_Inv_M2 (ends 1928)) = 1.9kb. | <br> ▶ Tubes 1&2, 5&6 have bands <750bp as well as primer dimers (but the annealing temperature was calculated for prefix suffix primers not universal ones…I’ll try thermo-gradient thermocycler protocol next time). Expected band size for 5&6 (FP-prefix, RP_Inv_M2 (ends 1928)) = 1.9kb. | ||
<br> ▶ No bands for tubes 7&8. Expected band size for 7&8 (RP-suffix, FP_Inv_M1 (starts 1046)) = 2.2kb. | <br> ▶ No bands for tubes 7&8. Expected band size for 7&8 (RP-suffix, FP_Inv_M1 (starts 1046)) = 2.2kb. | ||
+ | </span> | ||
</div> | </div> |
Revision as of 19:41, 17 September 2015
Research Notebook |
Week 8 (12/7 - 18/7)
|