Difference between revisions of "Team:UC San Diego/Notebook"
Line 26: | Line 26: | ||
<!------------------------------------ WEEK JAMBOREE EDIT --> | <!------------------------------------ WEEK JAMBOREE EDIT --> | ||
<!--WEEK JAMBOREE--> | <!--WEEK JAMBOREE--> | ||
− | <!-- <div class="cd-timeline-block"> | + | <!--- <div class="cd-timeline-block"> |
<div class="cd-timeline-img cd-jamb"> | <div class="cd-timeline-img cd-jamb"> | ||
<i class="fa fa-gears fa-lg"></i> | <i class="fa fa-gears fa-lg"></i> | ||
Line 43: | Line 43: | ||
</div> <!-- cd-timeline-block --> | </div> <!-- cd-timeline-block --> | ||
− | --> | + | ---> |
<!------------------------------------ WEEK 14 EDIT --> | <!------------------------------------ WEEK 14 EDIT --> |
Revision as of 08:06, 18 September 2015
TIMELINE
Computational
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 14Wet Lab
+Final preparations before the wiki freeze.
WEEK 14Title of section 2
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum aut hic quasi placeat iure tempora laudantium ipsa ad debitis unde?
Read more about what we did! WEEK 13Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 13Wet Lab
+ Mapped out errors in the parts that we assembled
+ Mutagenesis to fix recurring errors in C sequence
Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 12Wet Lab
+ Attempted Gibson Assembly with CDE with AB
+ Designed sequence primers
+ Miniprepped full size clones
Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 11Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 11Wet Lab
+ Attempted full gibson assembly of AB fragment
+ Miniprepped CDE fragments
Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 10Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 10Wet Lab
+ Selected error free clones for CDE fragments from sequencing data
+ Designed primers for PacBio Sequencing
+ Transformed error free clones of CDE
week 9
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 9week 9
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 9Wet Lab
+ Assembled using Gibson Assembly and sequenced CDE fragments
+ PCR and transformed fragments
Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 8Wet Lab
+ Received our DNA fragments from SGI.
+ Attempted to PCR and transform our fragments.
Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 7Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 7Wet Lab
+ Assembled Interlab Devices. Resuspended and measured them successfully.
+ Prepared YPD plates.
Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 6Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 6Wet Lab
+ Continued interlab study with miniprep, restriction digests, ligation, gel electrophoresis and gel purification.
WEEK 6Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 5Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 5Wet Lab
+ Started interlab study with transformation.
WEEK 5Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 4Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 4Wet Lab
+ Sent our genes to SGI and ordered lab supplies. Almost ready to go!
WEEK 4Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 3Section 13
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Iusto, optio, dolorum provident rerum.
WEEK 3Wet Lab
+ Added frp gene sequence from Vibrio Harveyi to our plasmid to stabilize the production of luciferase.
+ Optimized our plasmid sequences.
Website
More website ideas.
WEEK 2Computational
Read papers on drive
Read about metabolic control analysis
Compiled notes on bioluminescent system
Literature research:understanding bioluminescent mechanism
> aldehyde synthesis
> FMNH2 production
> light production
Familiarized with COBRA module
Primer to Genome-Scale Modeled and COBRA Tutorial (Jahir)
Continued literature search for key mechanisms regarding our auto-induced bioluminescent reaction in a yeast model
>auto-induced therefore no coupling between cells (removed LuxI and LuxR genes)
Wet Lab
+ Created a preliminary design for the plasmids using ApE.
+ Improved them over the week by adding tags, removed illegal restriction sites, and changing repetitive sequences.
Website
Discussed and designed website prototypes.
WEEK 1Computational
Developed Primer to MATLAB Programming
> lecture material from MIT course and UCSD course
> reading material from UCSD course
> study and practice material MIT course and UCSD course
Wet Lab
+ Found genes coding for fatty acid reductase complex that have been validated in an in vitro synthesis paper.
+ Planned how to assemble our plasmids and determined nucleotide sequences for lux A-E of Photobacterium Phosphoreum.
+ Compared the amino acid sequences to those of other organisms on BLAST to check for significant discrepancies in our sequence.