Difference between revisions of "Team:UMBC-Maryland/Notebook"
Line 5: | Line 5: | ||
'''Week 1''' | '''Week 1''' | ||
<br> | <br> | ||
− | <br> June 1st | + | <br> [[June 1st]] |
<br> First meeting of the project over summer where we ran our PCR products on a 1% agarose gel with results shown in UVP01993.jpg | <br> First meeting of the project over summer where we ran our PCR products on a 1% agarose gel with results shown in UVP01993.jpg | ||
<br> | <br> | ||
− | <br> June 4th | + | <br> [[June 4th]] |
<br> iGEM team members attended a meeting with a professor and was given an overview to the procedure of 3A Assembly. We also discussed team structure and the CUP1 gene construct that is needed to be synthesized as a G-block. G-blocks are then submitted to IDT for sequencing. | <br> iGEM team members attended a meeting with a professor and was given an overview to the procedure of 3A Assembly. We also discussed team structure and the CUP1 gene construct that is needed to be synthesized as a G-block. G-blocks are then submitted to IDT for sequencing. | ||
Revision as of 00:59, 8 June 2015
Notebook
'''Week 1'''[[June 1st]]
First meeting of the project over summer where we ran our PCR products on a 1% agarose gel with results shown in UVP01993.jpg
[[June 4th]]
iGEM team members attended a meeting with a professor and was given an overview to the procedure of 3A Assembly. We also discussed team structure and the CUP1 gene construct that is needed to be synthesized as a G-block. G-blocks are then submitted to IDT for sequencing.
Document the dates you worked on your project.
What should this page have?
- Chronological notes of what your team is doing.
- Brief descriptions of daily important events.
- Pictures of your progress.
- Mention who participated in what task.
Inspiration
You can see what others teams have done to organize their notes: