<br> iGEM team members attended a meeting with a professor and was given an overview to the procedure of 3A Assembly. We also discussed team structure and the CUP1 gene construct that is needed to be synthesized as a G-block. G-blocks are then submitted to IDT for sequencing. | <br> iGEM team members attended a meeting with a professor and was given an overview to the procedure of 3A Assembly. We also discussed team structure and the CUP1 gene construct that is needed to be synthesized as a G-block. G-blocks are then submitted to IDT for sequencing. | ||
− | + | <br> | |
+ | <br> [[June 8th]] | ||
+ | <br> Digest products with a combination of restriction enzymes ( XbaI, HindIII, EcoRI)were ran on a 2% agarose gel. Both gel results came up inconclusive. | ||
<p> Document the dates you worked on your project.</p> | <p> Document the dates you worked on your project.</p> | ||
Revision as of 18:19, 8 June 2015
Notebook
'''Week 1'''[[June 1st]]
First meeting of the project over summer where we ran our PCR products on a 1% agarose gel with results shown in 6_1_15PCR.jpg. Band sizzes are determined from the ladder in N0467_thumb.gif.
[[June 4th]]
iGEM team members attended a meeting with a professor and was given an overview to the procedure of 3A Assembly. We also discussed team structure and the CUP1 gene construct that is needed to be synthesized as a G-block. G-blocks are then submitted to IDT for sequencing.
[[June 8th]]
Digest products with a combination of restriction enzymes ( XbaI, HindIII, EcoRI)were ran on a 2% agarose gel. Both gel results came up inconclusive.
Document the dates you worked on your project.
What should this page have?
- Chronological notes of what your team is doing.
- Brief descriptions of daily important events.
- Pictures of your progress.
- Mention who participated in what task.
Inspiration
You can see what others teams have done to organize their notes: